ZLD-34/24V/ADR/EM Product Information1. Operations for installation, maintainance For address operations refer to the or testing must be done by authorized installation manual of the panel. Please personnel only. 2. The device, must be connected only to the GR-8600 panel via its ADR line. 3. First set the address before installation For address operations refer to the installation manual of the panel. Please see manual of CBS panel GR-8600 for maximum number of luminaires that can be interconnected. Horizontal TabsDocumentation User Manual Declaration of Conformity Certifications Test Report BSI Certification